|
A flattering picture of me dressed for grinding after the interior mold stations and luan sheathing have been removed. Two layers of 17 oz. biaxial tape were then laid around the perimeter of the interior of the new deck, where it met the orignal deck, and at all bulkhead intersections.
|
|